Case Study – Belfast City Hospital, Acute Mental Health Centre
Posted On: 27 May 2022
A recent project that we were entailed to design, supply, install and commission a full hydronic underfloor heating system at Belfast City Hospital, Acute Mental Health Centre has now opened its doors.
The new centre provides 80 acute mental health en-suite bedrooms including six psychiatric intensive care beds and administration facilities, all arranged across five inter-connected low-rise buildings.
Check out this case study in detail on Our project section on the website.